Chicago Transit Authority Red Line Extension

The Red Line Extension is the most transformational project in the history of the Chicago Transit Authority (CTA). The project will extend CTA’s busiest rail line from its current terminus at 95th Street to the southern border of Chicago’s city limits at 130th Street to address a decades-long gap in transit connectivity to Chicago’s Far South Side. Equity is the foundation of the extension project, and CTA intends to incorporate different procurement methods to maximize HUB participation. 


Case Studies